Pages

Framed!

Framing almost complete. Guys have made good progress on site considering the weather; timing lunch breaks with rain showers helps a lot! :)

A lot of scaffolding!

The open plan living, dining going on to front deck.

Living to front deck.

Getting ready for more beams here!

A sun/daybed will be just on the inside of this north facing window.

Roof support

Rear view

Back verandah will be polished concrete

Up up and away!! (Upper floor framing)

The Enviroarch team are powering through our build. So much getting done each day. Even caught them on site working past 5pm one afternoon! Very impressed.

Dining "picture" window taking shape, as is front deck!

Veiw from back of block. (Western Elevation)



One floor down, one to go!

Ground floor practically finished. Will head out over the weekend to take some more photos as builders have done a stack of work today.


See the steel beam for the cantileevered dining room far left!


The outlook from almost on second story, can't quite get up tha high yet.

Frame - Lower Level

Frame is up - well almost, the lower level is done and for the first time we've been able to walk through and get a good idea of the the layout and dimensions. So far so good.

From front centre of block.

Garage! Nice and spacious. (Single)

NE corner, master bedroom.

Welcome - main entry!

View from Master Bedroom window.